Main page - Projects - The development of highways - The latitudinal highway of high-speed traffic with a bridge across the river Neva in the alignment of st. Fayansovaya - st. Zolnaya (4, 5 stage)

The latitudinal highway of high-speed traffic with a bridge across the river Neva in the alignment of st. Fayansovaya - st. Zolnaya (4, 5 stage)

Project Description:

In accordance with the General Plan for the Development of St. Petersburg, the latitudinal high-speed highway with a bridge across the river. Neva in alignment Fayansovasya Street. - Ash Str. is one of the main links in the framework of the urban highways for high-speed and continuous traffic along with the Ring Road and the Western High-Speed Diameter.
The creation of the latitudinal highway is the most important stage in the development of the transport system of St. Petersburg, which provides direct communication between the eastern districts of urban development with the south of the city and indirectly through the WHSD to the north, leading transit traffic to the system of high-speed and continuous highways bypassing the city's road network.
The object is divided into 6 stages: The
1 stage- from the WHSD to Vitebsky Prospect; The
2 stage- from Vitebsky Pr. to Soyuzniy Pr.; The
3 stage- from Soyuzniy pr. to the Kommuny st.; The
4 stage- from the Kommuny st. (from the borders of St. Petersburg) to the Ring Road; The
5 stage- from the Ring Road to the junction with the federal highway M18 "Kola"; The
6 stage - from the Kommuny st. to the highway "St. Petersburg - Koltushi." The
Within the framework of 4 and 5 stages, a territory planning project is currently being developed by order of the Directorate.

Project objectives:

  • Creation of a new road linking St. Petersburg and the Leningrad Region to the demanded direction;  

  • Switching part of the traffic from the most busy sections of the federal highway "Kola" and the southeast part of the Ring Road;  

  • Direct connection of the eastern regions with the city center;  

  • Communication of the eastern areas of urban development through the WHSD to the northern and southern part of the city, bypassing the street-road network;  

  • Switching of transit transport from the city street-road network;  

  • Construction of a new bridge connecting right and left banks of the river Neva ;  

  • Creation of conditions for development of the territories of the "gray industrial belt" of St. Petersburg with an area of ​​more than 4,000 hectares in the immediate vicinity of the historical center;  

  • Connection to the perspective road "Entrance to the city of Vsevolozhsk".

    Project Budget and Funding Sources:

    Timeline for implementation:

    -

    Project Managers:

    Petr Golumbevsky

    Head of Unit

    Phone: (812) 305-28-28 (доб. 1114)

    E-mail: Petr.Golumbevskiy@spbtrd.ru